Construction
Reduce Strike Risk Before Excavation Begins

On Going Problem
Utility Work Leaves Less Room for Error
When your crews are working around buried power, gas, water, and telecom lines, uncertainty creates real risk.
Locator markings, plans, and existing maps are part of the process, but they don't always answer the questions that matters most: Is is safe to dig here, right now?
When the answer is unclear, your crews face strike risk, service disruption, rework, delays, and avoidable cost.
GroundScope
The Final Check Before You Begin
GroundScope gives your crew a fast, practical way to confirm what’s below the surface right before digging.
Simply scan the area and get clear, easy-to-understand feedback right on site, so your team can make decisions without slowing down the job.
No specialists, no delays, and no guesswork. Just a simple step that helps you move forward with confidence.
Applications
Where GroundScope Fits Into Construction Work

Pre-Excavation Verification
Confirm underground conditions before trenching or digging begins.

Trenching & Utility Installation
Scan planned paths to decrease risk during installation work.

Roadwork & Infrastructure Projects
Verify subsurface conditions in high-traffic and complex environments.

Site Development
Improve visibility before grading, foundation work, and underground prep.

Progressive Scanning During Digging
Maintain awareness as excavation advances.

Change Orders & Unplanned Work
Quickly assess new dig areas without waiting for additional surveys.

System Upgrades and Tie-Ins
Work with better intelligence when digging around active lines and existing assets.
Key Benefits
Built for the Reality of the Jobsite
Keep Projects Moving Forward
Reduce delays caused by uncertainty or unexpected underground conditions.
Protect Service Continuity
Make better dig decisions around critical buried infrastructure.
Reduce Risk of Utility Strikes
Add a final verification step where it matters most.
No Specialist Required
Field crews can operate it with minimal training.
Fast, On-Demand Decisions
Get answers directly on-site without waiting on additional services.
Fits Your Existing Workflow
Works alongside 811, GPR, and standard construction processes.


Utility Risk Cloud
From Field Scans to Project Visibility
Every scan captured in the field becomes part of a structured job record via the Utility Risk Cloud.
Instead of isolated scans, your team builds a clear record of underground verification across every job.
Frequently Asked Questions
Everything You Need to Know
When should GroundScope be used on a construction site?
After 811 markings and before excavation starts. Many teams also use it during excavation for ongoing visibility.
Does this replace utility locates or engineered surveys?
No. It complements existing processes by adding a final verification step before digging.
Will this slow down my crew?
No. A standard scan takes seconds and fits naturally into pre-dig workflows.
Do I need a trained specialist to operate it?
No. Most operators can learn to use GroundScope in minutes.
How does this help reduce rework?
By identifying potential underground issues before digging begins, crews can avoid mistakes that lead to costly corrections.
What types of projects is this best for?
GroundScope is ideal for civil construction, site development, roadwork, infrastructure projects, and any job involving excavation.
See It On Your Jobsite
Experience real-time underground intelligence in real-world conditions. Schedule a demo and see how GroundScope helps reduce risk, rework, and costly surprises.
